PDA

View Full Version : Trialer Galvanizing coming along



Old Blue
07-23-2016, 09:41 PM
I picked up my trailer frame and parts from Calwest Galvanizing on Thursday. Loading the frame onto the trailer was drama free so it was all good. The road trips in and out of Long Beach wasn't to bad either. The tab for the stripping sandblasting and galvanizing came out to $1010, which was a little less than I thought it was going to be.

Reassembly is going a little slower than I would like but its coming along.

http://www.bocaboard.com/forum/attachment.php?attachmentid=195

NoSlack
07-24-2016, 09:46 AM
Get off the computer and get back on your tools. The fish are 5-10 of the beach.

Old Blue
07-24-2016, 10:58 AM
Ya I hear you Mike.
I still have some trailer wiring, winch stand and brake issues but it's 90% done. The plan is to reload it and fit the bunks to it on wed am.

Now if the diver cleaning my hull on Monday can get me my 12 knots back I'll be doing the happy dance.